Pleasant View, Safe Routes to School Program

Location: Pleasant View, Tennessee
Client: City of Pleasant View

Lose & Associates assisted the town of Pleasant View with a successful Safe Routes to School grant application for 2,200 LF of sidewalks along a busy thoroughfare through town. After the grant was approved by the Tennessee DOT, our civil engineers prepared all designs and construction documents for sidewalks, storm utilities, erosion control (both permanent and temporary), curbs, striping and signage. Other documentation for construction included the environmental clearance letters, change directives, change orders, preparation of bid advertisement, bid evaluations including reference checks and low-bid recommendation, punch lists, as-builts and close-out documents.